![]() On the building siteWeek No. 8-10:
There were a final 3 weeks of work inside the house, the walls were wallpapered and painted, the ceilings were painted the floors were covered with hardwood panels, carpets and ceramic tiles. Sanitary ware was installed and internal doors and skirtings were put in position. At the very end of the project the staircase was installed. The crew went back home to spend some time with their families for Christmas and the Wilhelms moved into the house on 27 December.
|
||
|
|