Day 1:

 

The trucks with all the elements and materials, assembly team and the crane arrived on site as per the agreed programme. The ground floor walls were placed in position on a concrete foundation slab that was built by the Customer. The walls were screwed together with special bolts. After all the ground floor walls were in position the floor elements are craned onto the top of the walls.


 

Day 2:

 

All the first floor walls were placed in position on top of the first floor. All the external walls have the doors and windows already installed in the factory.