DAN-WOOD Technology

header.png

Your house in three steps:

Opis obrazka dla accessibility i SEO

Modern production process

The technical drawings are transmitted from the designers' computers to the factory via fiber optic cable.

krok-2.png

Transport and construction

Immediately after production, the house elements are transported to the construction site on large trucks.

krok-3.png

Ready to move-in

In eight to twelve weeks from the teams arriving on site you’re able to move in!!

How your DAN-WOOD house is built:

From architectural plans to production

The architectural plans for your house are sent to our factory in Poland where structural engineers design and build each component of your house including the walls, floors and roof panels.

sekcja-1.jpg

Precision ensured by advanced digital software

 

The timber-frame components are precision-manufactured thanks to advanced digital software. Windows, doors, fire-resistant wall insulation, some service ducts and electrical connections are all installed at this time.

sekcja-2.jpg

The highest level of quality assurance

The internal walls are either prepared for your own application of paint, wallpaper or tiles, or are finished according to your choices. The advanced technology and our skilled workers ensure the highest quality construction in very safe conditions.

Every component of the house is given a final quality-control inspection before it leaves the factory.

sekcja-3.jpg

Straight from the factory to your site

All house components and building materials are shipped to your site on special trucks, with a team of skilled tradesmen who are ready to start work. Massive cranes assemble individual elements of the house – typically the basic structure will be in place in one or two days. The house will be roofed and watertight within one to four days. Once construction is complete, a dedicated team begins work on the interior. This includes heating and electrical installations, fitting doors, decorating, flooring and tiling to your specified choices. In eight to twelve weeks from the teams arriving on site you’re able to move in!!

Linia Today & Family

Efektywny proces produkcji i montażu. 
Gotowe w 6-12 tygodni.

Linia Vision

Luksusowe wykończenie z wielkoformatowymi oknami montowanymi na miejscu.

Linia NEXT

Powstają w całości w fabryce. Moduły wykończone "pod klucz" – łącznie z oknami, drzwiami, ogrzewaniem podłogowym, wykończeniem ścian i podłóg są następnie dostarczane na plac budowy i składane w ciągu kilku godzin.

Your home wll be ready to move into in just 8-12 weeks!